CARBOTURA
Executive Brief ← Document Hub
Community Benefits · Minot, North Dakota · April 2026

What Carbotura Means for Minot and Ward County

Minot's household and commercial material becomes manufacturing feedstock for a local Advanced Circular Manufacturing facility. Ownership transfers to Carbotura on delivery. Carbotura carries 100% of the capital; the City and County carry none. In return for a per-ton Beneficiation Fee, Minot receives a Circular Royalty™ on every ton for the 30-year CSA term.

Not a cheaper landfill: a royalty that exceeds the fee from Year 2, on zero public capital, with the landfill's airspace kept for longer.

~25
Direct jobs, Phase Initial
100 TPD · estimated
~50
Direct jobs, Phase Medium
200 TPD · estimated
$75M
Carbotura capital, Phase Initial
$130M at Phase Medium
$0
City or County capital
No bond, no pledge
~45%
Of landfill MSW intake
36,500 t/yr at 100 TPD
$51
Landfill MSW gate rate
Fee is $100 · above it

Jobs and Local Economy

The facility creates skilled manufacturing jobs in Minot, and each direct job supports additional indirect employment in the region. Job figures are estimated from standard per-TPD scaling, not from a site study.

🏭
Direct Manufacturing Jobs
Operations staff, process technicians, quality engineers, safety personnel, and maintenance workers — all based at the Minot facility, local hire first.
25 jobs at startup
Supported Local Jobs
Each direct facility job is estimated to support roughly three indirect jobs in transportation, equipment service, food service and supply chains.
~75 indirect at 100 TPD (est.)
📈
Economic Ripple Effect
Worker wages circulate in the Minot economy: spent at local businesses, generating sales tax and supporting the regional tax base. Phase Medium (200 TPD) roughly doubles the direct workforce to ~50.
~50 direct at 200 TPD (est.)
🏗️
Deployment Phase Jobs
Deploying and integrating the ACM modules takes 12–24 months from permit issuance to commercial operation, with civil, mechanical and electrical trades work on site.
12–24 mo from permit
🎓
Workforce Development
Carbotura targets local hire and will work with regional colleges and training providers to develop apprenticeship and training pathways for Minot residents.
Local hire first
🏠
Private Capital Investment
Carbotura funds the facility: $75M at Phase Initial (100 TPD) and $130M at Phase Medium (200 TPD, $75M first module plus a $55M additional module). No public subsidy is requested. Property-tax treatment follows North Dakota law.
$75M–$130M Carbotura capital

Environmental Benefits

Every ton manufactured into products is a ton that does not occupy cell space at the City of Minot Landfill.

Designed-for performance

All environmental performance figures below reflect designed-for targets under the Carbotura manufacturing process. Site-specific performance will be verified during the Term Sheet phase and confirmed through operational monitoring.

🌱
Landfill Airspace
The City of Minot Landfill reports about 82,000 t/yr of municipal intake. Phase Initial would take 36,500 t/yr (about 45%); Phase Medium 73,000 t/yr (about 89%). Cell 7, approved in January 2023 at $2.36M, was expected to last about 5–7 years; diverted tonnage stretches that airspace further.
~45% → ~89% of MSW intake
🌍
Carbon Negative Operation
The facility is designed to be net carbon negative — manufacturing graphite and other products sequester more carbon than the process emits. The facility powers itself using hydrogen produced in the conversion process, drawing almost nothing from the power grid.
Net carbon negative
⚗️
PFAS Destruction
PFAS, the "forever chemicals", cannot survive elemental dissociation; downstream processing at 1,800–3,000°C fully breaks them down in both OmniCrude™ streams. North Dakota has no state PFAS rule; NDDEQ monitors PFAS, including landfill leachate since 2018.
Designed-for PFAS destruction
💧
No Landfill Leachate
Landfills produce leachate, contaminated liquid that must be collected and treated. Tonnage delivered to the Carbotura facility instead of the landfill generates no new leachate there.
No new leachate from diverted tons
⚡
Self-Powered Facility
The conversion process produces hydrogen, which powers the facility itself. This means near-zero external grid draw — reducing strain on the local power infrastructure.
Near-zero grid draw
♻️
Circular Economy
Materials that would have ended their life in a Ward County landfill are converted into manufactured outputs — graphite and other products that re-enter the supply chain.
Circular by design

What It Means for Public Finances

One commercial structure, the Circular Supply Agreement (CSA): the Feedstock Provider pays a Beneficiation Fee per ton delivered, and Carbotura pays a Circular Royalty™ per ton. The two are separate gross payments.

The honest comparison

Beneficiation Fee (TMC Fee): $100/ton in Year 1, escalating 2.5%/yr — the bottom of the standard $100–$150/ton range. $100/ton is above the City of Minot Landfill's published MSW gate rate of $51/ton (effective 2025-01-01, City rate schedule). Carbotura claims no disposal saving. The case is the Circular Royalty™, no City or County capital, longer landfill life, and a manufacturing destination for the material.

💰
No Public Capital Required
Carbotura deploys, owns and operates the facility at its own expense. No G.O. bond, no revenue bond, no pledge of full faith and credit. The facility is Carbotura's asset; the royalty is the Feedstock Provider's income.
$0 City or County capital
🔄
The Circular Supply Agreement (CSA)
The Circular Royalty™ is 120% of the current-year Beneficiation Fee in Year 1, rising 1 percentage point a year. It is paid 13 months after Carbotura's receipt of each Beneficiation Fee payment. From Year 2 the royalty received exceeds the fee paid, and the gap widens every year.
Royalty exceeds fee from Year 2
YearFee / tonRoyalty received / ton100 TPD fee100 TPD royalty200 TPD fee200 TPD royalty
1$100.00$0 (pre-royalty)$3.65M$0$7.29M$0
2$102.50$120.00$3.74M$4.38M$7.48M$8.76M
10$124.89$155.96$4.56M$5.69M$9.12M$11.38M
30$204.64$295.48$7.47M$10.79M$14.94M$21.57M
30-yr gross  ~$160.2M~$207.3M~$320.5M~$414.7M

Royalty received, receipts basis: paid 13 months in arrears; Year n = M(n−1) × BF(n−1). Illustrative. Fee and royalty are independent gross amounts and are never netted.

Residential collection stays with City Sanitation on its twice-weekly routes. What changes is where the trucks deliver: to the Carbotura facility instead of the landfill cells.

Partnerships with Bismarck or Grand Forks could be possible later additions under separate agreements. They are not sized or included in any figure on this page.

Where It All Happens

No parcel has been identified. Candidate areas are being reviewed on industrially zoned land (the City's M1, M2 and M3 districts); the facility marker below is illustrative only.

Map requires a Google Maps API key.

Set GOOGLE_MAPS_API_KEY in config.js.

Frequently Asked Questions

Answers to the questions Ward County residents and officials ask most often.

About the Facility
What exactly does the facility do?▾

The Carbotura facility converts household and commercial manufacturing feedstock into manufactured products using MCR (Microwave Catalytic Reforming), which performs electromagnetic elemental dissociation. It is not burning and not incineration. The process runs in a sealed, oxygen-free environment with no open flame and no combustion, and its outputs are Circular Materials such as synthetic graphite.

Is this incineration?▾

No. Incineration burns material in the presence of oxygen. The Carbotura process operates in an anoxic (oxygen-free) environment, which is mechanistically incompatible with combustion. Carbotura is not waste-to-energy and sells no power. Carbotura pursues manufacturing classification (NAICS 31–33); nothing in the agreement is contingent on it.

How big will the facility be?▾

Phase Initial is 100 tons per day (36,500 t/yr), about 45% of the roughly 82,000 t/yr of municipal material the City of Minot Landfill reports receiving. Phase Medium, 200 tons per day (73,000 t/yr, about 89%), is a later step, when the County chooses. Capacity grows by adding identical ACM modules, not by building a larger plant.

Jobs and Local Economy
Will Minot residents actually get the jobs?▾

Carbotura's policy is local hire first. The company will work with regional colleges and training providers to develop training pathways for local residents. Operations, maintenance and technical roles are all accessible through apprenticeship programs.

What kinds of jobs are created?▾

The jobs range across skill levels. Process operators and materials handlers are entry-level and trainable. Quality control technicians, instrumentation and controls specialists, and safety personnel require technical training. Site managers and engineers typically require college credentials. Estimated headcount is ~25 direct at 100 TPD and ~50 at 200 TPD, with roughly three indirect jobs per direct job.

Environment and Safety
Is the facility safe to live near?▾

The process is enclosed and oxygen-free, with no open flame, no combustion emissions and no ash, and is designed for near-zero emissions. Solid waste rules in North Dakota sit under NDAC 33.1-20 and NDCC 23.1-08, administered by the North Dakota Department of Environmental Quality (NDDEQ). The permits that apply to this facility, including air quality and groundwater review, are confirmed with NDDEQ in pre-application meetings before any facility operates.

What happens to the material — does it just disappear?▾

No. It is converted. The Carbotura process resolves feedstock into its elements and synthesizes them into manufactured products, primarily synthetic graphite and other carbon-based Circular Materials. About 100% of input becomes manufactured output: roughly 90% is sold and roughly 10% is used inside the plant to power it. The design target is near-zero residual.

What about PFAS — the "forever chemicals"?▾

The Carbotura process is designed to destroy PFAS compounds in incoming feedstock: downstream processing at 1,800–3,000°C fully breaks them down. In a landfill, PFAS stays in place and can reach leachate. North Dakota has no state PFAS rule today; NDDEQ monitors PFAS, including landfill leachate since 2018.

Public Finances
Does the City or County have to pay for the facility?▾

No. Carbotura finances, owns and operates the entire facility: $75M at Phase Initial and $130M at Phase Medium. The Feedstock Provider's financial commitment is the Beneficiation Fee on material delivered: $100/ton in Year 1, escalating 2.5%/yr. That is above the landfill's published $51/ton MSW gate rate, so this is not a saving on disposal. The public side takes on no deployment debt, no bonding obligation and no operating risk.

How does Minot actually make money from this?▾

Carbotura pays a Circular Royalty™ on every ton: 120% of the current-year Beneficiation Fee in Year 1, rising one percentage point every year. Each royalty payment is made 13 months after Carbotura's receipt of the corresponding Beneficiation Fee payment. On a receipts basis that is $120.00/ton in Year 2 against a $102.50 fee, and $295.48/ton in Year 30 against a $204.64 fee. At 100 TPD the 30-year gross royalty is about $207.3M and the 30-year gross fee about $160.2M.

What happens to the current City of Minot Landfill arrangement?▾

The City of Minot owns and operates the landfill and keeps doing so. At Phase Initial the landfill still receives the remaining municipal tonnage and its inert stream (about 68,800 t/yr reported). Existing contracts are reviewed during LOI/MOU execution, and the transition is planned around them. Carbotura does not require anyone to break an existing contract.

Decision Process
How does Ward County decide whether to do this?▾

The decision is made by the governing body that signs the CSA, through its standard public approval process: public notice, review and a vote. Before capital is deployed, a Deployment Study verifies costs, revenues and site impacts. Residents can review the full documentation on this portal and at any public meetings.

Is there a deadline? What happens if Minot waits?▾

There is no deadline. Commercial operation follows 12–24 months from permit issuance, and the royalty begins 13 months after Carbotura's receipt of each Beneficiation Fee payment. Waiting moves both later by the same amount; it does not change the terms.

Regulatory Classification
What determines whether this facility can operate in Ward County?▾

The key regulatory question is how the facility is classified: as manufacturing, or as waste treatment. Carbotura pursues manufacturing classification (NAICS 31–33), not solid-waste management (NAICS 562). Classification determines which permits are required, which agency has oversight and what standards apply.

Under the Regulatory Predicate Transition (RPT), both parties commit to the dewaste pathway and the endpoint is categorical: manufacturing. Interim bridging authorities may apply while that confirmation is pursued. Nothing in the agreement is contingent on it.

In plain terms: Carbotura's facility is designed as a manufacturer, not a landfill, not an incinerator and not a waste-to-energy plant, and both sides work toward that classification together.

Who regulates the facility in North Dakota?▾

The North Dakota Department of Environmental Quality (NDDEQ) administers solid waste rules under NDAC 33.1-20 and NDCC 23.1-08, along with air and water permitting. North Dakota has no advanced-recycling or manufacturing-classification statute, so the permitting pathway for this facility is confirmed with NDDEQ in pre-application engagement, before any agreement is signed.

This page describes community and resident benefits of the proposed Carbotura facility. Employment figures are estimates from standard per-TPD scaling; financial figures are illustrative and computed on the CSA formula; environmental performance is design intent. Actual performance will be confirmed through the Deployment Study and operational monitoring. This proposal does not bind either party before CSA execution. Contact: info[at]carbotura.com

Was this Community Benefits overview useful?
Community Benefits · 11 min read · DOC 05 OF 06

What this document is

What an Advanced Circular Manufacturing facility means for residents — what changes at the kerb, what Minot receives, the jobs created, and the environmental effect.

Three things this document says
  1. Nothing changes at the curb: City Sanitation collects as it does today, and the material goes to manufacturing instead of the landfill cells.
  2. Minot pays a $100/ton Beneficiation Fee (above the landfill's $51 gate rate) and receives a Circular Royalty™ that exceeds the fee from Year 2; Carbotura carries all the capital.
  3. Phase Initial (100 TPD) brings ~25 direct jobs and takes about 45% of the landfill's municipal intake; Phase Medium (200 TPD) about doubles both.
Looking for something else?

Basis of Presentation

Basis of Presentation — Assumptions & Confidence

Source-of-truth references for the key figures cited throughout this document. Full Assumption Registry available on request from the Minot engagement team.

FieldValueConfidenceSource
Beneficiation Fee Year 1$100/ton — the bottom of the standard $100–$150/ton rangeAPPROVEDArchitect approval, 2026-11-12
Beneficiation Fee escalator2.5%/yr compoundedMODELEDCSA formula
Circular Royalty™ received Year 2 / Year 30$120.00 / $295.48 per ton (receipts basis)MODELEDCSA formula: M(n−1) × BF(n−1)
City of Minot Landfill MSW gate rate$51/ton (inert $37/ton), effective 2025-01-01VERIFIEDminotnd.gov Landfill Rates
Landfill intake~82,000 t/yr MSW + ~68,800 t/yr inert, six countiesREPORTEDVendor case study, post-2011 (retrieved 2026-11-10)
Ward County population68,233 (2025 estimate)VERIFIEDMinot Daily News, 2026-03-26
Phase Initial / Phase Medium100 TPD (36,500 t/yr) / 200 TPD (73,000 t/yr)MODELED365 operating days
CSA term30-year CSA termMODELEDStandard CSA
Direct FTE (Phase Initial / Medium)~25 / ~50ESTIMATEDStandard per-TPD scaling
Indirect employment (Phase Initial / Medium)~75 / ~150ESTIMATEDRoughly 3× direct
Carbotura capital$75M (100 TPD) / $130M (200 TPD)MODELED$75M first module + $55M additional module

Confidence flags: VERIFIED (published source) APPROVED (Architect decision) MODELED (calculated from documented inputs) REPORTED (published but undated) ESTIMATED (best-available, confirmed at Term Sheet phase). Other sources: City of Minot Landfill; NDDEQ active MSW landfills; City Sanitation carts.